Wittig Solar is a 107 MW Solar project in Texas, currently active.
Greenalia Solar Power Wittig LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-30.
- Queue ID
- ERCOT-26INR0144
- Location
- Wharton, Texas
- Technology
- Solar
- Developer
- Greenalia Solar Power Wittig LLC
- Market / region
- ERCOT
- Point of interconnection
- 138 kV Gulftie (#43340) – San Bernard (#43110)
What stands out
1
Wittig Solar is a 107 MW Solar project in Texas with status active.
2
Greenalia Solar Power Wittig LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-10-30.
Market and operating context
- Queue date
- 2024-02-27
- Proposed COD
- 2028-10-30
- IA status
- Facility Study
- Study phase
- Facility Study