Briefing/projectactive
Winters Glow Solar is a 302 MW Solar+Battery project in Texas, currently active.
Winters Glow Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-19.
- Queue ID
- ERCOT-28INR0198
- Location
- Runnels, Texas
- Technology
- Solar+Battery
- Developer
- Winters Glow Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 1444 BROWN SWITCH - 11406 CENTRAL BLUFF
What stands out
1
Winters Glow Solar is a 302 MW Solar+Battery project in Texas with status active.
2
Winters Glow Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-19.
Market and operating context
- Queue date
- 2024-10-29
- Proposed COD
- 2028-09-19
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.