Query
Winchester Power Park
Type
Entity Briefing
Entity
Winchester Power Park
State
AR
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Winchester Power Park

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

242 MW
Capacity
Operating
Current status
2010
Operating since
4
Generators
2.4%
Capacity factor
52 GWh
Annual generation
Briefing/plantOperating

Winchester Power Park is a 242 MW Natural Gas Fired Combustion Turbine asset in ERCOT (Texas), currently Operating.

Winchester Power Park is reported in Texas since 2010 under Lower Colorado River Authority. Available operating and financial measures include 2.4% capacity factor and 52 GWh annual generation; $965/kW reported CapEx.

Location
Fayette, Texas
Technology
Natural Gas Fired Combustion Turbine
Owner / parent
Lower Colorado River Authority
Operator
Lower Colorado River Authority
Grid
ERCOT (Texas)
Plant ID
56674

What stands out

1

Winchester Power Park is a 242 MW Natural Gas Fired Combustion Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 2.4% capacity factor and 52 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#117 of 325
National rank
#726 of 2,025

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.