Briefing on Whitewright Solar 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
302 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-05-02
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Whitewright Solar 2 is a 302 MW Solar project in Texas, currently active.

SunWR, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-02.

Queue ID
ERCOT-26INR0300
Location
Grayson, Texas
Technology
Solar
Developer
SunWR, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 1729 Valley South – Anna Switch 2373

What stands out

1

Whitewright Solar 2 is a 302 MW Solar project in Texas with status active.

2

SunWR, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-02.

4

Latest linked story: “168-MW solar project completed in northeast Texas” (Solar Power World, 2021-09-29).

Market and operating context

Queue date
2023-12-18
Proposed COD
2028-05-02
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Whitewright Solar 2 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0300
LocationGrayson, Texas
TechnologySolar
DeveloperSunWR, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 1729 Valley South – Anna Switch 2373
Queue date2023-12-18