Query
What's the status of the 1 queue project linked to Gregory Power Plant?
Type
Entity Briefing
Entity
Gregory Power Development SLF
Generated
2026-10-11T14:57:04.838Z

Briefing on Gregory Power Development SLF

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
470 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2028-12-19
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Gregory Power Development SLF is a 470 MW Gas project in Texas, currently active.

Cheniere Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-19.

Queue ID
ERCOT-29INR0068
Location
San Patricio, Texas
Technology
Gas
Developer
Cheniere Energy
Market / region
ERCOT
Point of interconnection
8580 Resnick 138kV

What stands out

1

Gregory Power Development SLF is a 470 MW Gas project in Texas with status active.

2

Cheniere Energy is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-19.

Market and operating context

Queue date
2024-11-19
Proposed COD
2028-12-19
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gregory Power Development SLF — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0068
LocationSan Patricio, Texas
TechnologyGas
DeveloperCheniere Energy
Market / regionERCOT
Point of interconnection8580 Resnick 138kV
Queue date2024-11-19
Proposed COD2028-12-19