Briefing/projectactive
Gregory Power Development SLF is a 470 MW Gas project in Texas, currently active.
Cheniere Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-19.
- Queue ID
- ERCOT-29INR0068
- Location
- San Patricio, Texas
- Technology
- Gas
- Developer
- Cheniere Energy
- Market / region
- ERCOT
- Point of interconnection
- 8580 Resnick 138kV
What stands out
1
Gregory Power Development SLF is a 470 MW Gas project in Texas with status active.
2
Cheniere Energy is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-12-19.
Market and operating context
- Queue date
- 2024-11-19
- Proposed COD
- 2028-12-19
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.