Gregory Power Development SLF (ERCOT-29INR0068) — Project Summary

Queue ID
ERCOT-29INR0068
Capacity
469.9 MW
Technology
Gas
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Gregory Power Partners LLC
IA Status
Facility Study

Gregory Power Development SLF

ERCOT-29INR0068BetaActiveGasERCOTLBNL + Live

469.9 MW generation in San Patricio, TX · In queue since November 2024 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

469.9 MW

Capacity

1

Components

Gas

2 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 1m

Facilities Study50%
Queue EntryNov 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-19

Queue history
29INR0068 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

0 times

Dec 2028 → Dec 2028

Net change

0 months

first report to latest

Capacity

1038 → 470 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 19, 2024
Interconnection agreement signedJul 1, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 19, 2028
From queue filing
Developer in saved assessment
Gregory Power Partners LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA date. No evidence of construction, permitting or financing activity.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-29inr0068
  2. cleanview.co/power-projects/planned/natural-gas-power-plants/texas/29INR0068/gregory-power-development-slf
  3. interxdata.com/projects/gregory-power-development-slf-ercot-gis-report-29inr0068/

Commercial operation date: Only the LBNL/ERCOT proposed COD of 2028-12-19 exists. Aggregator pages (interconnection.fyi, Cleanview: 'Expected online 2028') repeat the queue data and are not independent confirmation. No press release or news article gives a different date.

Developer: The only developer name in any source is the LBNL filing entity, Gregory Power Partners LLC, which the aggregators repeat. No source identifies a different parent or operating company, so a shell-vs-parent call can't be made.

Status: LBNL shows active with a Facility Study IA status, and interconnection.fyi agrees. The interxdata page calls the project 'operational', but that conflicts with the Facility Study stage and a 2028 proposed COD, so it is probably a data error and was discounted.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Gregory Power Development SLF (queue ID ERCOT-29INR0068) is a proposed natural gas-fired generation project in San Patricio County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Gregory Power Partners LLC, the project has a total proposed capacity of 469.9 megawatts (MW), consisting entirely of gas-fired generation. The project would interconnect to the grid at the 8580 Resnick 138 kV point of interconnection. It is linked to an existing operating facility, the Gregory Power Plant (EIA plant ID 55086).

The project entered the ERCOT interconnection queue on November 19, 2024, and currently holds an active status. As of the latest available data, it is in the Facility Study phase of the interconnection process. It has not yet executed an interconnection agreement. The developer has proposed a commercial operation date of December 19, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gregory Power Partners LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8580 Resnick 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
LGE_LGE_STG
POI Substation
Gregory Switchyard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.