Briefing/projectactive
Deckerville Solar Park Project is a 213 MW Solar project in Michigan, currently active.
DTE Energy is the reported developer. The reported queue phase is ERAS Study Cycle 2. Proposed COD is 2028-04-01.
- Queue ID
- MISO-E0019
- Location
- Sanilac, Michigan
- Technology
- Solar
- Developer
- DTE Energy
- Market / region
- MISO
- Point of interconnection
- Greenwood-Rapson 345kV
What stands out
1
Deckerville Solar Park Project is a 213 MW Solar project in Michigan with status active.
2
DTE Energy is the reported developer.
3
The reported queue phase is ERAS Study Cycle 2; proposed COD is 2028-04-01.
Market and operating context
- Queue date
- 2025-08-06
- Proposed COD
- 2028-04-01
- IA status
- In Progress (unknown study)
- Study phase
- ERAS Study Cycle 2
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.