Briefing on Deckerville Solar Park Project

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
213 MW
Proposed capacity
active
Current status
Solar
Technology
MISO
Market / region
2028-04-01
Proposed COD
ERAS Study Cycle 2
Queue phase
Briefing/projectactive

Deckerville Solar Park Project is a 213 MW Solar project in Michigan, currently active.

DTE Energy is the reported developer. The reported queue phase is ERAS Study Cycle 2. Proposed COD is 2028-04-01.

Queue ID
MISO-E0019
Location
Sanilac, Michigan
Technology
Solar
Developer
DTE Energy
Market / region
MISO
Point of interconnection
Greenwood-Rapson 345kV

What stands out

1

Deckerville Solar Park Project is a 213 MW Solar project in Michigan with status active.

2

DTE Energy is the reported developer.

3

The reported queue phase is ERAS Study Cycle 2; proposed COD is 2028-04-01.

Market and operating context

Queue date
2025-08-06
Proposed COD
2028-04-01
IA status
In Progress (unknown study)
Study phase
ERAS Study Cycle 2
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Deckerville Solar Park Project — verified asset snapshot

FieldValue
Queue IDMISO-E0019
LocationSanilac, Michigan
TechnologySolar
DeveloperDTE Energy
Market / regionMISO
Point of interconnectionGreenwood-Rapson 345kV
Queue date2025-08-06
Proposed COD2028-04-01