Deckerville Solar Park Project
213.18 MW generation in Sanilac, MI · In queue since August 2025 · Proposed COD April 2028
213.18 MW
Capacity
1
Components
Solar
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 8m
Study Phase
ERAS Study Cycle 2
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Entered MISO queue with interconnection study in progress
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of April 2028. No independent news or press releases found to validate or contradict this date.
Developer: LBNL lists DTE Electric as developer, which is the operating utility company itself (not a shell LLC). No news coverage found to confirm or provide additional ownership details.
Status: LBNL status shows active with interconnection study underway. No news coverage to indicate construction activity, permitting milestones, or status changes.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Deckerville Solar Park Project is a proposed 213.18 MW solar generation project in Sanilac County, Michigan. It is being developed by DTE Electric, which is also the associated utility. The project would connect to the grid at the Greenwood-Rapson 345kV point of interconnection and has requested Network Resource Interconnection Service (NRIS). The project is linked in Energy Information Administration (EIA) records to an existing plant entry named Deckerville Solar Park (EIA plant ID 69776).
The project is listed with an active status in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0019. It entered the queue on August 6, 2025, and is being evaluated in MISO's Expedited Resource Addition Study (ERAS) Study Cycle 2. Its interconnection agreement status is reported as in progress, though the specific study stage is not identified. The proposed commercial operation date is April 1, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MI
County
Sanilac
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
DTE Electric
Utility
DTE Electric
Entity
MISO
Service Type
NRIS
Point of Interconnection
Greenwood-Rapson 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Michigan in Michigan growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Michigan Wind 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Sky High Solar
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.