Briefing on Western Flats Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
410 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-11-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Western Flats Solar is a 410 MW Solar+Battery project in Texas, currently active.

Hecate Energy Point Mountain Solar Facility 1 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-01.

Queue ID
ERCOT-26INR0110
Location
Crane, Texas
Technology
Solar+Battery
Developer
Hecate Energy Point Mountain Solar Facility 1 LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.

What stands out

1

Western Flats Solar is a 410 MW Solar+Battery project in Texas with status active.

2

Hecate Energy Point Mountain Solar Facility 1 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-11-01.

4

Latest linked story: “A solar farm is underway at Flint Hills Corpus Christi plant. What are the benefits?” (Corpus Christi Caller-Times, 2024-12-12).

Market and operating context

Queue date
2023-04-07
Proposed COD
2028-11-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Western Flats Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0110
LocationCrane, Texas
TechnologySolar+Battery
DeveloperHecate Energy Point Mountain Solar Facility 1 LLC
Market / regionERCOT
Point of interconnectionTap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.
Queue date2023-04-07
Proposed COD2028-11-01