Western Flats Solar is a 410 MW Solar+Battery project in Texas, currently active.
Hecate Energy Point Mountain Solar Facility 1 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-01.
- Queue ID
- ERCOT-26INR0110
- Location
- Crane, Texas
- Technology
- Solar+Battery
- Developer
- Hecate Energy Point Mountain Solar Facility 1 LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.
What stands out
Western Flats Solar is a 410 MW Solar+Battery project in Texas with status active.
Hecate Energy Point Mountain Solar Facility 1 LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-11-01.
Latest linked story: “A solar farm is underway at Flint Hills Corpus Christi plant. What are the benefits?” (Corpus Christi Caller-Times, 2024-12-12).
Market and operating context
- Queue date
- 2023-04-07
- Proposed COD
- 2028-11-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.