Western Flats Solar (ERCOT-26INR0110) — Project Summary

Queue ID
ERCOT-26INR0110
Capacity
410.2 MW
Technology
Solar+Battery
Status
active
Location
Crane, TX
Region
ERCOT
Developer
Hecate Energy Point Mountain Solar Facility 1 LLC
IA Status
Facility Study

Western Flats Solar

ERCOT-26INR0110BetaActiveSolarBatteryERCOTLBNL + Live

410.2 MW hybrid in Crane, TX · In queue since April 2023 · Proposed COD November 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

410.2 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntryApr 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-01

Queue history
26INR0110 · 35 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

1 time

Dec 2026 → Nov 2028

Net change

+23 months

first report to latest

Capacity

410 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 7, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 23 months ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneunder constructionCorpus Christi Caller-Times · 2024-12-12
Expected CODQ3 2025Corpus Christi Caller-Times · 2024-12-12

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Nov 1, 2028
From queue filing
Developer in saved assessment
Hecate Energy
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage, with no IA date. No public evidence of construction, permitting or financing for this project.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0110
  2. cleanview.co/planned-solar-projects/TX/26INR0110/western-flats-solar

Commercial operation date: Only the LBNL/ERCOT date exists (proposed COD 2028-11-01). Cleanview and interconnection.fyi repeat it but are not independent. The news-extracted 'Q3 2025' COD is for the Flint Hills Corpus Christi Solar Farm, a different project, so it was discarded.

Developer: The only evidence is the LBNL filing entity, whose name points to Hecate Energy as parent. This is inferred from the name and no press release confirms it. The news-extracted developer, Flint Hills Resources, belongs to a Corpus Christi project and is not tied to this Crane County project.

Status: LBNL lists the project as active, and the aggregator pages (which mirror the queue data) agree. No source contradicts it. The 'under construction' news item concerns an unrelated Flint Hills project.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Western Flats Solar is a proposed 410.2 MW solar generation project located in Crane County, Texas. The project is being developed by Hecate Energy Point Mountain Solar Facility 1 LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0110, with a queue entry date of April 7, 2023, and a proposed commercial operation date of November 1, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 410.2 MW of solar generation capacity. The point of interconnection (POI) is Tap 138 kV 76615 Crane -76635 King Mountain, located 7.85 miles from Crane. The Western Flats Solar project has been mentioned in recent industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Crane

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Point Mountain Solar Facility 1 LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.

Data Source

LBNL + Live

DeveloperFlint Hills ResourcesCorpus Christi Caller-Times · 2024-12-12
EPC contractorDEPCOM PowerCorpus Christi Caller-Times · 2024-12-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Crane East Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.