Briefing/projectactive
Wensowitch Solar is a 146 MW Solar project in Texas, currently active.
Greenalia Solar Power Wensowitch LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-18.
- Queue ID
- ERCOT-24INR0205
- Location
- Navarro, Texas
- Technology
- Solar
- Developer
- Greenalia Solar Power Wensowitch LLC
- Market / region
- ERCOT
- Point of interconnection
- Tapping 138 kV line Telico (192) to Montfort Switch (3454)
What stands out
1
Wensowitch Solar is a 146 MW Solar project in Texas with status active.
2
Greenalia Solar Power Wensowitch LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-18.
Market and operating context
- Queue date
- 2022-01-07
- Proposed COD
- 2028-09-18
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.