Query
Warren Meadow Solar
Type
Entity Briefing
Entity
Warren Meadow Solar
Generated
2026-10-19T23:18:32.209Z

Briefing on Warren Meadow Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
75 MW
Proposed capacity
active
Current status
Solar
Technology
ISO-NE
Market / region
2026-11-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Warren Meadow Solar is a 75 MW Solar project in Maine, currently active.

The reported queue phase is IA Executed. Proposed COD is 2026-11-30.

Queue ID
ISO-NE-1086
Location
Knox, Maine
Technology
Solar
Market / region
ISO-NE
Point of interconnection
CMP 115kV line Section 80

What stands out

1

Warren Meadow Solar is a 75 MW Solar project in Maine with status active.

2

The reported queue phase is IA Executed; proposed COD is 2026-11-30.

Market and operating context

Queue date
2020-11-30
Proposed COD
2026-11-30
IA status
IA Executed
Study phase
IA Executed
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Warren Meadow Solar — verified asset snapshot

FieldValue
Queue IDISO-NE-1086
LocationKnox, Maine
TechnologySolar
Market / regionISO-NE
Point of interconnectionCMP 115kV line Section 80
Queue date2020-11-30
Proposed COD2026-11-30
IA statusIA Executed