Briefing on Wander Waters BESS

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

304 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-10-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Wander Waters BESS is a 304 MW Battery project in Texas, currently active.

Wander Waters BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-31.

Queue ID
ERCOT-27INR0207
Location
Wilbarger, Texas
Technology
Battery
Developer
Wander Waters BESS LLC
Market / region
ERCOT
Point of interconnection
61001 JIMTREEC7A 345kV

What stands out

1

Wander Waters BESS is a 304 MW Battery project in Texas with status active.

2

Wander Waters BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-10-31.

Market and operating context

Queue date
2024-03-22
Proposed COD
2027-10-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wander Waters BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0207
LocationWilbarger, Texas
TechnologyBattery
DeveloperWander Waters BESS LLC
Market / regionERCOT
Point of interconnection61001 JIMTREEC7A 345kV
Queue date2024-03-22
Proposed COD2027-10-31