Briefing on Verily Solar (FKA Cuello De Cuero Solar)

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
261 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Verily Solar (FKA Cuello De Cuero Solar) is a 261 MW Solar project in Texas, currently active.

NextEra Energy Interconnection Holdings, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-01.

Queue ID
ERCOT-28INR0059
Location
Brooks, Texas
Technology
Solar
Developer
NextEra Energy Interconnection Holdings, LLC
Market / region
ERCOT
Point of interconnection
80078 Reforzar Switch Station 345kV

What stands out

1

Verily Solar (FKA Cuello De Cuero Solar) is a 261 MW Solar project in Texas with status active.

2

NextEra Energy Interconnection Holdings, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-01.

Market and operating context

Queue date
2024-03-22
Proposed COD
2029-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Verily Solar (FKA Cuello De Cuero Solar) — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0059
LocationBrooks, Texas
TechnologySolar
DeveloperNextEra Energy Interconnection Holdings, LLC
Market / regionERCOT
Point of interconnection80078 Reforzar Switch Station 345kV
Queue date2024-03-22
Proposed COD2029-07-01