Verily Solar (FKA Cuello De Cuero Solar)
261 MW generation in Brooks, TX · In queue since March 2024 · Proposed COD July 2029
261 MW
Capacity
1
Components
Solar
2y 4m
In Queue
Facility Study
IA Phase
COD target: 2029
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-01
Entered ERCOT interconnection queue, Facility Study phase
The Verily Solar (FKA Cuello De Cuero Solar) project is a proposed 250 MW solar generation project located in Brooks County, Texas. Developed by NextEra Energy Interconnection Holdings, LLC, the project entered the ERCOT interconnection queue as ERCOT-28INR0059 on March 22, 2024. The proposed commercial operation date is July 1, 2029, and the project's interconnection status is currently in the Facility Study phase.
The project consists of 250 MW of solar photovoltaic generation. It is interconnected at the 80078 Reforzar Switch Station 345kV. The project is currently listed as active within the ERCOT interconnection queue.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Brooks
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NextEra Energy Interconnection Holdings, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
80078 Reforzar Switch Station 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- STAR_SLR_RN
- POI Substation
- Roma Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.