Venture Hill Storage is a 70 MW Battery project in Texas, currently active.
KCE TX 24, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-01.
- Queue ID
- ERCOT-22INR0488
- Location
- Travis, Texas
- Technology
- Battery
- Developer
- KCE TX 24, LLC
- Market / region
- ERCOT
- Point of interconnection
- 7336 Gilleland Creek 138kV
What stands out
Venture Hill Storage is a 70 MW Battery project in Texas with status active.
KCE TX 24, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2026-12-01.
Latest linked story: “Integrated Power & Renewables: TotalEnergies Implements its Strategy of Capital Recycling with an Acquisition in Germany and a Farm Down in the US” (TotalEnergies.com, 2024-12-04).
Market and operating context
- Queue date
- 2021-02-09
- Proposed COD
- 2026-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.