Briefing on Two Step Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
405 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-09-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Two Step Solar is a 405 MW Solar project in Texas, currently active.

Two Step Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-17.

Queue ID
ERCOT-29INR0196
Location
Ellis, Texas
Technology
Solar
Developer
Two Step Solar, LLC
Market / region
ERCOT
Point of interconnection
NAVARRO to VENUS_N5

What stands out

1

Two Step Solar is a 405 MW Solar project in Texas with status active.

2

Two Step Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-09-17.

4

Latest linked story: “Flint Hills Resources celebrated the commissioning of new $53M solar farm” (KRIS 6 News, 2025-10-01).

Market and operating context

Queue date
2025-12-17
Proposed COD
2029-09-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Two Step Solar — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0196
LocationEllis, Texas
TechnologySolar
DeveloperTwo Step Solar, LLC
Market / regionERCOT
Point of interconnectionNAVARRO to VENUS_N5
Queue date2025-12-17
Proposed COD2029-09-17