Two Step Solar is a 405 MW Solar project in Texas, currently active.
Two Step Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-17.
- Queue ID
- ERCOT-29INR0196
- Location
- Ellis, Texas
- Technology
- Solar
- Developer
- Two Step Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- NAVARRO to VENUS_N5
What stands out
Two Step Solar is a 405 MW Solar project in Texas with status active.
Two Step Solar, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2029-09-17.
Latest linked story: “Flint Hills Resources celebrated the commissioning of new $53M solar farm” (KRIS 6 News, 2025-10-01).
Market and operating context
- Queue date
- 2025-12-17
- Proposed COD
- 2029-09-17
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.