Two Forks BESS is a 310 MW Battery project in Texas, currently active.
Two Forks LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-06-30.
- Queue ID
- ERCOT-24INR0198
- Location
- Cooke, Texas
- Technology
- Battery
- Developer
- Two Forks LLC
- Market / region
- ERCOT
- Point of interconnection
- 684 SPRING 138kV
What stands out
Two Forks BESS is a 310 MW Battery project in Texas with status active.
Two Forks LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2027-06-30.
Latest linked story: “Broad Reach Power completes 200-MWh battery portfolio to support renewables on ERCOT grid” (Solar Power World, 2021-11-02).
Market and operating context
- Queue date
- 2022-01-28
- Proposed COD
- 2027-06-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.