Two Forks BESS
Type
Entity Briefing
Entity
Two Forks BESS
State
TN
Technology
battery
Generated
2026-10-06T17:34:37.153Z

Briefing on Two Forks BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
310 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Two Forks BESS is a 310 MW Battery project in Texas, currently active.

Two Forks LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-06-30.

Queue ID
ERCOT-24INR0198
Location
Cooke, Texas
Technology
Battery
Developer
Two Forks LLC
Market / region
ERCOT
Point of interconnection
684 SPRING 138kV

What stands out

1

Two Forks BESS is a 310 MW Battery project in Texas with status active.

2

Two Forks LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-06-30.

4

Latest linked story: “Broad Reach Power completes 200-MWh battery portfolio to support renewables on ERCOT grid” (Solar Power World, 2021-11-02).

Market and operating context

Queue date
2022-01-28
Proposed COD
2027-06-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Two Forks BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0198
LocationCooke, Texas
TechnologyBattery
DeveloperTwo Forks LLC
Market / regionERCOT
Point of interconnection684 SPRING 138kV
Queue date2022-01-28
Proposed COD2027-06-30