Query
Twinwood Solar 1
Type
Entity Briefing
Entity
Twinwood Solar 1
Generated
2026-10-19T06:23:38.452Z

Briefing on Twinwood Solar 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
358 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-10-27
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Twinwood Solar 1 is a 358 MW Solar project in Texas, currently active.

Twinwood PV1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-27.

Queue ID
ERCOT-26INR0425
Location
Waller, Texas
Technology
Solar
Developer
Twinwood PV1, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8

What stands out

1

Twinwood Solar 1 is a 358 MW Solar project in Texas with status active.

2

Twinwood PV1, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-10-27.

Market and operating context

Queue date
2024-03-22
Proposed COD
2027-10-27
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Twinwood Solar 1 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0425
LocationWaller, Texas
TechnologySolar
DeveloperTwinwood PV1, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8
Queue date2024-03-22
Proposed COD2027-10-27