Tumbleweed Solar is a 614 MW Solar+Battery project in Texas, currently active.
Hecate Energy Tumbleweed Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-27INR0086
- Location
- Borden, Texas
- Technology
- Solar+Battery
- Developer
- Hecate Energy Tumbleweed Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- 59905 Faraday 345 kV
What stands out
1
Tumbleweed Solar is a 614 MW Solar+Battery project in Texas with status active.
2
Hecate Energy Tumbleweed Solar LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2023-09-22
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters