Tumbleweed Solar (ERCOT-27INR0086) — Project Summary

Queue ID
ERCOT-27INR0086
Capacity
613.89 MW
Technology
Solar+Battery
Status
suspended
Location
Borden, TX
Region
ERCOT
Developer
Hecate Energy Tumbleweed Solar LLC
IA Status
Facility Study

Tumbleweed Solar

ERCOT-27INR0086BetaSuspendedSolarBatteryERCOTLBNL + Live

613.89 MW hybrid in Borden, TX · In queue since September 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

613.89 MW

Capacity

1

Components

Solar

3y 2m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

Suspended50%
Queue EntrySep 22, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

Queue history
27INR0086 · 25 monthly ERCOT reports, Apr 2024 – Apr 2026

Projected COD moved

0 times

Dec 2027 → Dec 2027

Net change

0 months

first report to latest

Capacity

615 → 614 MW

changed in the reports

Latest stage

Screening started

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 22, 2023
On ERCOT's inactive listMay 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2027
From queue filing
Developer in saved assessment
Hecate Energy
Filed as Hecate Energy Tumbleweed Solar LLC
Status at research time
Active
Active — In Development, Facility Study phase per ERCOT queue
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. hecateenergy.com/projects/
  2. cleanview.co/power-projects/planned/solar-farms/texas/27INR0086/tumbleweed-solar
  3. power-technology.com/data-insights/power-plant-profile-tumbleweed-solar-pv-park-us/

Commercial operation date: LBNL queue filing shows December 2027 COD. Hecate Energy's project page lists the project as 'In Development' with 600 MW solar capacity, but provides no specific COD date. No press releases or news articles with updated timeline found.

Developer: LBNL filing uses project-specific LLC 'Hecate Energy Tumbleweed Solar LLC'. Hecate Energy's corporate project page lists 'Tumbleweed Solar' as an active development project, confirming Hecate Energy as the parent operating company.

Status: LBNL shows 'active' status in Facility Study phase. Hecate Energy's project page confirms project is 'In Development'. No construction announcements or permitting milestones found in recent news.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Tumbleweed Solar is a proposed hybrid solar and battery storage development project in Borden County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Hecate Energy Tumbleweed Solar LLC and has a total listed capacity of 613.89 megawatts (MW). The project data identifies solar and battery technologies, and the solar component accounts for the full 613.89 MW. No separate capacity is specified for the battery storage component. The project would interconnect at the Faraday 345 kV point of interconnection (bus 59905).

The project entered the ERCOT interconnection queue on September 22, 2023, under queue ID 27INR0086. Its interconnection agreement status is listed at the Facility Study stage, and its proposed commercial operation date is December 1, 2027. The project's current queue status is recorded as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Borden

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Tumbleweed Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

59905 Faraday 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Faraday Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.