Briefing on Tres Bahias Solar

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
195 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-04-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Tres Bahias Solar is a 195 MW Solar project in Texas, currently active.

Tres Bahias Solar Power LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-30.

Queue ID
ERCOT-20INR0266
Location
Calhoun, Texas
Technology
Solar
Developer
Tres Bahias Solar Power LLC
Market / region
ERCOT
Point of interconnection
8140 Joslin 138kV

What stands out

1

Tres Bahias Solar is a 195 MW Solar project in Texas with status active.

2

Tres Bahias Solar Power LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-04-30.

4

Latest linked story: “SWIFT CURRENT ENERGY ANNOUNCES POWER PURCHASE AGREEMENT AND TAX EQUITY FINANCING FOR 260 MW SOLAR PROJECT IN TEXAS” (PR Newswire, 2024-03-26).

Market and operating context

Queue date
2019-03-26
Proposed COD
2026-04-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Tres Bahias Solar — verified asset snapshot

FieldValue
Queue IDERCOT-20INR0266
LocationCalhoun, Texas
TechnologySolar
DeveloperTres Bahias Solar Power LLC
Market / regionERCOT
Point of interconnection8140 Joslin 138kV
Queue date2019-03-26
Proposed COD2026-04-30