Query
Tolar Energy Center
Type
Entity Briefing
Entity
Tolar Energy Center
Generated
2026-10-19T14:03:13.588Z

Briefing on Tolar Energy Center

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
1.3 GW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2030-06-10
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Tolar Energy Center is a 1.3 GW Gas project in Texas, currently active.

NRG Tolar Power LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-06-10.

Queue ID
ERCOT-29INR0180
Location
Hood, Texas
Technology
Gas
Developer
NRG Tolar Power LLC
Market / region
ERCOT
Point of interconnection
Tap 345 KV circuit 1 from 1440 Comanche Switch to 1900 Comanche Peak SES.

What stands out

1

Tolar Energy Center is a 1.3 GW Gas project in Texas with status active.

2

NRG Tolar Power LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-06-10.

4

Latest linked story: “NRG Energy, GE Vernova and Kiewit Accelerating New Generation Capacity to Support Demand Growth” (Business Wire, 2025-02-26).

Market and operating context

Queue date
2025-09-22
Proposed COD
2030-06-10
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Tolar Energy Center — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0180
LocationHood, Texas
TechnologyGas
DeveloperNRG Tolar Power LLC
Market / regionERCOT
Point of interconnectionTap 345 KV circuit 1 from 1440 Comanche Switch to 1900 Comanche Peak SES.
Queue date2025-09-22
Proposed COD2030-06-10