Tolar Energy Center is a 1.3 GW Gas project in Texas, currently active.
NRG Tolar Power LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-06-10.
- Queue ID
- ERCOT-29INR0180
- Location
- Hood, Texas
- Technology
- Gas
- Developer
- NRG Tolar Power LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 KV circuit 1 from 1440 Comanche Switch to 1900 Comanche Peak SES.
What stands out
Tolar Energy Center is a 1.3 GW Gas project in Texas with status active.
NRG Tolar Power LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-06-10.
Latest linked story: “NRG Energy, GE Vernova and Kiewit Accelerating New Generation Capacity to Support Demand Growth” (Business Wire, 2025-02-26).
Market and operating context
- Queue date
- 2025-09-22
- Proposed COD
- 2030-06-10
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.