TOCE TX BESS 2 is a 523 MW Battery project in Texas, currently active.
TOCE TX BESS 2, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-01.
- Queue ID
- ERCOT-26INR0334
- Location
- Wharton, Texas
- Technology
- Battery
- Developer
- TOCE TX BESS 2, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 44200 Hillje - 44000 WA Parrish 345 kV
What stands out
TOCE TX BESS 2 is a 523 MW Battery project in Texas with status active.
TOCE TX BESS 2, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-08-01.
Latest linked story: “Jupiter Power’s Flower Valley II energy storage facility comes online in Texas” (pv magazine USA, 2022-04-04).
Market and operating context
- Queue date
- 2024-02-02
- Proposed COD
- 2027-08-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.