Query
TOCE GA 1 Solar Solar in Georgia growth signals — PPAs, construction, new projects
Type
Entity Briefing
Entity
TOCE TX BESS 2
State
GA
Technology
solar
Generated
2026-10-11T01:43:00.707Z

Briefing on TOCE TX BESS 2

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
523 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-08-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

TOCE TX BESS 2 is a 523 MW Battery project in Texas, currently active.

TOCE TX BESS 2, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-01.

Queue ID
ERCOT-26INR0334
Location
Wharton, Texas
Technology
Battery
Developer
TOCE TX BESS 2, LLC
Market / region
ERCOT
Point of interconnection
Tap 44200 Hillje - 44000 WA Parrish 345 kV

What stands out

1

TOCE TX BESS 2 is a 523 MW Battery project in Texas with status active.

2

TOCE TX BESS 2, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-08-01.

4

Latest linked story: “Jupiter Power’s Flower Valley II energy storage facility comes online in Texas” (pv magazine USA, 2022-04-04).

Market and operating context

Queue date
2024-02-02
Proposed COD
2027-08-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

TOCE TX BESS 2 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0334
LocationWharton, Texas
TechnologyBattery
DeveloperTOCE TX BESS 2, LLC
Market / regionERCOT
Point of interconnectionTap 44200 Hillje - 44000 WA Parrish 345 kV
Queue date2024-02-02
Proposed COD2027-08-01