TOCE TX BESS 2 (ERCOT-26INR0334) — Project Summary

Queue ID
ERCOT-26INR0334
Capacity
523.38 MW
Technology
Battery
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
TOCE TX BESS 2, LLC
IA Status
Facility Study

TOCE TX BESS 2

ERCOT-26INR0334BetaActiveBatteryERCOTLBNL

523.38 MW storage in Wharton, TX · In queue since February 2024 · Proposed COD August 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

523.38 MW

Capacity

1

Components

Battery

2y 9m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 6m

Facilities Study50%
Queue EntryFeb 2, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-08-01

Queue history
26INR0334 · 25 monthly ERCOT reports, Jan 2024 – Jan 2026

Projected COD moved

1 time

Sep 2026 → Aug 2027

Net change

+11 months

first report to latest

Capacity

506 → 523 MW

changed in the reports

Latest stage

Cancelled

last listed Jan 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 2, 2024
Facilities study approvedJun 5, 2025
CancelledFeb 25, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 4y 7m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalpv magazine USA · 2022-04-04

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 1, 2027
From queue filing
Developer in saved assessment
TOCE TX BESS 2, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA date. One aggregator (ercotqueue.com) lists the developer's only project as 'dropped', which conflicts with LBNL and is unverified.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0334
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0334/toce-tx-bess-2
  3. ercotqueue.com/developer/toce-tx-bess-2-llc
  4. bizapedia.com/tx/toce-tx-bess-2-llc.html

Commercial operation date: Only the LBNL proposed COD (2027-08-01) is available. Cleanview's 'Expected online 2027' appears to be derived from the queue data, so it is not an independent confirmation. No developer press release or financing-backed target was found.

Developer: Only the project-LLC name appears in LBNL and in the aggregators. Bizapedia shows a Delaware LLC registered as a foreign entity in Texas in March 2025, with no parent or operating company named. The news-extracted facts (Flower Valley II, Jupiter Power, 100 MW, operational in 2022) describe a different project and were excluded.

Status: LBNL and the interconnection.fyi, Cleanview and Grid Status listings show the project as active or planned. The ercotqueue.com 'dropped' flag is an unexplained discrepancy, so LBNL's status is kept with low confidence.

Project lifecycle
as of 2022-04-04
PhaseOnlinepv magazine USA · 2022-04-04
OperationalYespv magazine USA · 2022-04-04
TechnologyBatterypv magazine USA · 2022-04-04
DeveloperJupiter Powerpv magazine USA · 2022-04-04
COD achievedReportedpv magazine USA · 2022-04-04

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

TOCE TX BESS 2 is a proposed battery storage project located in Wharton County, Texas. The project, developed by TOCE TX BESS 2, LLC, has a total capacity of 523.38 MW. It consists entirely of battery storage.

The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0334, with a queue entry date of February 2, 2024, and a proposed commercial operation date of August 1, 2027. Its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is Tap 44200 Hillje - 44000 WA Parrish 345 kV. The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jan 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

TOCE TX BESS 2, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 44200 Hillje - 44000 WA Parrish 345 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Hillje Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.