Briefing on Titus Sienta Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
502 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Titus Sienta Solar is a 502 MW Solar project in Texas, currently active.

Sol Sienta Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-01.

Queue ID
ERCOT-26INR0230
Location
Pecos, Texas
Technology
Solar
Developer
Sol Sienta Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub

What stands out

1

Titus Sienta Solar is a 502 MW Solar project in Texas with status active.

2

Sol Sienta Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-01.

Market and operating context

Queue date
2023-10-13
Proposed COD
2028-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Titus Sienta Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0230
LocationPecos, Texas
TechnologySolar
DeveloperSol Sienta Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 1239 Coyanosa - 11238 Blair Lake Sub
Queue date2023-10-13
Proposed COD2028-06-01