Titus Low Carbon Ventures Solar 1 is a 338 MW Solar project in Texas, currently active.
Vaquero Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-16.
- Queue ID
- ERCOT-26INR0211
- Location
- San Patricio, Texas
- Technology
- Solar
- Developer
- Vaquero Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 8249 Angstrom - 8624 Grissom
What stands out
Titus Low Carbon Ventures Solar 1 is a 338 MW Solar project in Texas with status active.
Vaquero Solar, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-10-16.
Latest linked story: “County hosting solar farm town hall in November” (The Graham Leader, 2025-10-20).
Market and operating context
- Queue date
- 2023-10-13
- Proposed COD
- 2028-10-16
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.