Briefing/projectactive
TEXPO is a 680 MW Gas project in Texas, currently active.
Oklaunion Power Station, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-31.
- Queue ID
- ERCOT-22INR0497
- Location
- Wilbarger, Texas
- Technology
- Gas
- Developer
- Oklaunion Power Station, LLC
- Market / region
- ERCOT
- Point of interconnection
- 6100 Oklaunion 345kV
What stands out
1
TEXPO is a 680 MW Gas project in Texas with status active.
2
Oklaunion Power Station, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-10-31.
Market and operating context
- Queue date
- 2021-03-16
- Proposed COD
- 2027-10-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.