Terror Lake Microgrid is a 34 MW Conventional Hydroelectric asset in Alaska, currently Operating.
Terror Lake Microgrid is reported in Alaska since 1984 under Kodiak Electric Assn Inc. Available operating and financial measures include 45.4% capacity factor and 134 GWh annual generation; $2294/kW reported CapEx.
- Location
- Kodiak Island, Alaska
- Technology
- Conventional Hydroelectric
- Owner / parent
- Kodiak Electric Assn Inc
- Operator
- Kodiak Electric Assn Inc
- Plant ID
- 71
What stands out
Terror Lake Microgrid is a 34 MW Conventional Hydroelectric asset in Alaska with status Operating.
Latest annual operating measures report 45.4% capacity factor and 134 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Latest linked story: “An Alaskan Island Goes 100% Renewable” (RMI, 2015-05-19).
Market and operating context
- State rank
- #4 of 31
- National rank
- #381 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.