33.6 MW Hydro operating in Kodiak Island, AK
Outside CONUS — spatial-market dimensions not provided by this dataset.
33.6 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1984
Operating Since
Coordinates
57.6861, -152.8950
County
Kodiak Island, AK
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Kodiak Electric Assn Inc | — | — |
| Owner(s) | Kodiak Electric Assn Inc | — | — |
| Status | Operating | — | — |
The Terror Lake Hydroelectric Generating Station is the principal power plant for Kodiak Island, Alaska. The Hydroelectricity station consists of three Pelton runner vertical shaft turbine units rated 11 megawatts each at 1200 feet head. Two units were installed when the station was constructed in 1985, and the third unit rated 11.5 MW was installed in the fall of 2013. The station is owned and operated by the Kodiak Electric Association, Inc., an electrical cooperative owned by its customers. The station is located about 25 miles from the city of Kodiak and is accessible only by air or boat.
Read more on WikipediaTerror Lake Microgrid is a hydroelectric power plant located in Kodiak Island County, Alaska. The plant has a total capacity of 33.6 MW consisting of three generators and is operated by Kodiak Electric Association Inc. It commenced operations in 1984, utilizing water as its primary fuel source and conventional hydroelectric technology.
In the most recent year with available data, the plant generated 134,080 MWh of electricity, achieving a capacity factor of 45.4%. Terror Lake Microgrid ranks as the 4th largest power plant out of 29 in Alaska, and 386th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
—
Market
—
NERC Region
—
Balancing Authority
—
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10.1K MWh
Latest Month
134.1K MWh
Annual Generation
45.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $77.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Terror Lake MicrogridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.