Briefing on Tanglewood Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
251 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-04-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Tanglewood Solar is a 251 MW Solar project in Texas, currently active.

Brazoria Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-30.

Queue ID
ERCOT-23INR0054
Location
Brazoria, Texas
Technology
Solar
Developer
Brazoria Solar, LLC
Market / region
ERCOT
Point of interconnection
345kV Seabreeze Substation

What stands out

1

Tanglewood Solar is a 251 MW Solar project in Texas with status active.

2

Brazoria Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-04-30.

4

Latest linked story: “Origis Energy hires RES to build 57.5MW Georgia project” (PV Tech, 2021-02-13).

Market and operating context

Queue date
2020-07-10
Proposed COD
2026-04-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Tanglewood Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0054
LocationBrazoria, Texas
TechnologySolar
DeveloperBrazoria Solar, LLC
Market / regionERCOT
Point of interconnection345kV Seabreeze Substation
Queue date2020-07-10