Briefing/projectactive
Tanglewood Solar is a 251 MW Solar project in Texas, currently active.
Brazoria Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-30.
- Queue ID
- ERCOT-23INR0054
- Location
- Brazoria, Texas
- Technology
- Solar
- Developer
- Brazoria Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- 345kV Seabreeze Substation
What stands out
1
Tanglewood Solar is a 251 MW Solar project in Texas with status active.
2
Brazoria Solar, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-04-30.
4
Latest linked story: “Origis Energy hires RES to build 57.5MW Georgia project” (PV Tech, 2021-02-13).
Market and operating context
- Queue date
- 2020-07-10
- Proposed COD
- 2026-04-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters