Query
Sunscape Renewable Energy Solar SLF
Type
Entity Briefing
Entity
Sunscape Renewable Energy Solar SLF
Technology
solar
Generated
2026-10-20T00:17:18.636Z

Briefing on Sunscape Renewable Energy Solar SLF

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
523 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Sunscape Renewable Energy Solar SLF is a 523 MW Solar+Battery project in Texas, currently active.

Sunscape Renewable Energy LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-06-30.

Queue ID
ERCOT-27INR0047
Location
Nueces, Texas
Technology
Solar+Battery
Developer
Sunscape Renewable Energy LLC
Market / region
ERCOT
Point of interconnection
Bus# 8455 Lon C Hill to Bus# 80078 Reforzar 345 kV Line

What stands out

1

Sunscape Renewable Energy Solar SLF is a 523 MW Solar+Battery project in Texas with status active.

2

Sunscape Renewable Energy LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-06-30.

Market and operating context

Queue date
2023-06-28
Proposed COD
2028-06-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sunscape Renewable Energy Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0047
LocationNueces, Texas
TechnologySolar+Battery
DeveloperSunscape Renewable Energy LLC
Market / regionERCOT
Point of interconnectionBus# 8455 Lon C Hill to Bus# 80078 Reforzar 345 kV Line
Queue date2023-06-28
Proposed COD2028-06-30