Sunrose Renewable Energy Solar SLF is a 310 MW Solar+Battery project in Texas, currently active.
Sunrose Renewable Energy LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-31.
- Queue ID
- ERCOT-28INR0061
- Location
- Austin, Texas
- Technology
- Solar+Battery
- Developer
- Sunrose Renewable Energy LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV #44740 WALLIS - #44700 GEBHRT
What stands out
Sunrose Renewable Energy Solar SLF is a 310 MW Solar+Battery project in Texas with status active.
Sunrose Renewable Energy LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2029-12-31.
Latest linked story: “Enbridge breaks ground on 815 MW Sequoia Solar project in Texas” (pv magazine USA, 2024-11-18).
Market and operating context
- Queue date
- 2024-04-09
- Proposed COD
- 2029-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.