Sunrose Renewable Energy Solar SLF (ERCOT-28INR0061) — Project Summary

Queue ID
ERCOT-28INR0061
Capacity
309.88 MW
Technology
Solar+Battery
Status
active
Location
Austin, TX
Region
ERCOT
Developer
Sunrose Renewable Energy LLC
IA Status
Facility Study

Sunrose Renewable Energy Solar SLF

ERCOT-28INR0061BetaActiveSolarBatteryERCOTLBNL + Live

309.88 MW hybrid in Austin, TX · In queue since April 2024 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

309.88 MW

Capacity

1

Components

Solar

2y 7m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Facilities Study50%
Queue EntryApr 9, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-04

Queue history
28INR0061 · 30 monthly ERCOT reports, Apr 2024 – Sep 2026

Projected COD moved

4 times

Dec 2027 → Jul 2029

Net change

+19 months

first report to latest

Capacity

301 → 310 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 9, 2024
Facilities study approvedSep 11, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2 years ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonegroundbreakingpv magazine USA · 2024-11-18
Expected COD2026pv magazine USA · 2024-11-18

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 4, 2029
From queue filing
Developer in saved assessment
Sunrose Renewable Energy
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. The project is proposed (about 300 MW solar plus 300 MW BESS on about 2,950 acres in Austin County) and no construction has been reported.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. sunroserenewableenergy.com/
  2. cleanview.co/power-projects/planned/solar-farms/texas/28INR0061/sunrose-renewable-energy-solar-slf
  3. ercotqueue.com/project/28INR0061
  4. interconnection.fyi/project/ercot-28inr0061
  5. app.nrgmap.com/queues/ercot-28inr0061

Commercial operation date: The only dated COD is the ERCOT queue's 2029-07-04, which aggregators such as Cleanview repeat ('Expected online 2029'). The developer site says the project 'could be operational as soon as 2028', but that is aspirational and not tied to financing or construction. The news-extracted 2026 COD belongs to Enbridge's 815 MW Sequoia Solar and was not used.

Developer: The project's own website and the queue trackers all name Sunrose Renewable Energy (LLC) as developer. The news-extracted 'Enbridge' attribution comes from an article about Sequoia Solar (815 MW), a different project, and nothing links Enbridge to this Austin County project, so it was rejected.

Status: LBNL and ercotqueue.com/nrgmap show the project as active with no IA, and the developer site calls it 'proposed'. The Interxdata 'operational' label contradicts every other source and was discounted. The 'construction' signal in the news facts comes from the unrelated Sequoia article.

Project lifecycle
as of 2024-11-18
PhaseConstructionpv magazine USA · 2024-11-18
OperationalNopv magazine USA · 2024-11-18
TechnologySolarpv magazine USA · 2024-11-18
DeveloperEnbridgepv magazine USA · 2024-11-18
PPA offtakerToyota, AT&Tpv magazine USA · 2024-11-18
GroundbreakingAnnouncedpv magazine USA · 2024-11-18
Permit decisionGrantedpv magazine USA · 2024-11-18

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sunrose Renewable Energy Solar SLF is a proposed solar generation project located in Austin County, Texas, within the ERCOT region. Developed by Sunrose Renewable Energy LLC, the project has a total capacity of 300.88 MW, consisting entirely of solar photovoltaic generation. The project entered the ERCOT interconnection queue as entry ERCOT-28INR0061 on April 9, 2024, and has a proposed commercial operation date of December 31, 2029. Its interconnection status is currently in the Facility Study phase.

The proposed project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Austin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sunrose Renewable Energy LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV #44740 WALLIS - #44700 GEBHRT

Data Source

LBNL + Live

DeveloperEnbridgepv magazine USA · 2024-11-18
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-19

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.