Briefing/projectactive
Sugar Maple Solar is a 125 MW Solar project in New York, currently active.
Sugar Maple Solar, LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2027-12-01.
- Queue ID
- NYISO-953
- Location
- Lewis, New York
- Technology
- Solar
- Developer
- Sugar Maple Solar, LLC
- Market / region
- NYISO
- Point of interconnection
- North Carthage - Taylorville #8 and Black River - Taylorville #2 115kV
What stands out
1
Sugar Maple Solar is a 125 MW Solar project in New York with status active.
2
Sugar Maple Solar, LLC is the reported developer.
3
The reported queue phase is System Impact Study; proposed COD is 2027-12-01.
4
Latest linked story: “Solar farm planned in Carthage area” (WWNY, 2025-01-07).
Market and operating context
- Queue date
- 2019-12-05
- Proposed COD
- 2027-12-01
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.