Stoneridge Solar is a 202 MW Solar project in Texas, currently active.
Stoneridge Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-01.
- Queue ID
- ERCOT-24INR0031
- Location
- Milam, Texas
- Technology
- Solar
- Developer
- Stoneridge Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP Beulah Switch to tap above line
What stands out
Stoneridge Solar is a 202 MW Solar project in Texas with status active.
Stoneridge Solar, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-04-01.
Latest linked story: “RWE powers on 200-MW solar + storage project in east-central Texas” (Solar Power World, 2025-11-26).
Market and operating context
- Queue date
- 2021-10-08
- Proposed COD
- 2026-04-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.