Staccato BESS is a 202 MW Battery project in Texas, currently active.
Staccato Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-31.
- Queue ID
- ERCOT-25INR0189
- Location
- Fayette, Texas
- Technology
- Battery
- Developer
- Staccato Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 138kV WARDA #7312.
What stands out
Staccato BESS is a 202 MW Battery project in Texas with status active.
Staccato Storage, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2026-12-31.
Latest linked story: “Neighbors Against Battery Storage Site Appeal Lawsuit” (The Fayette County Record, 2025-05-22).
Market and operating context
- Queue date
- 2022-11-07
- Proposed COD
- 2026-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.