Briefing on Staccato BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
202 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Staccato BESS is a 202 MW Battery project in Texas, currently active.

Staccato Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-31.

Queue ID
ERCOT-25INR0189
Location
Fayette, Texas
Technology
Battery
Developer
Staccato Storage, LLC
Market / region
ERCOT
Point of interconnection
138kV WARDA #7312.

What stands out

1

Staccato BESS is a 202 MW Battery project in Texas with status active.

2

Staccato Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-31.

4

Latest linked story: “Neighbors Against Battery Storage Site Appeal Lawsuit” (The Fayette County Record, 2025-05-22).

Market and operating context

Queue date
2022-11-07
Proposed COD
2026-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Staccato BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0189
LocationFayette, Texas
TechnologyBattery
DeveloperStaccato Storage, LLC
Market / regionERCOT
Point of interconnection138kV WARDA #7312.
Queue date2022-11-07
Proposed COD2026-12-31