Briefing/projectactive
SPECTRUM ENERGY STORAGE is a 504 MW Battery project in California, currently active.
The reported queue phase is C14. Proposed COD is 2032-02-29.
- Queue ID
- CAISO-1881
- Location
- Alameda, California
- Technology
- Battery
- Market / region
- CAISO
- Point of interconnection
- Tesla-Newark #1 230 kV Line
What stands out
1
SPECTRUM ENERGY STORAGE is a 504 MW Battery project in California with status active.
2
The reported queue phase is C14; proposed COD is 2032-02-29.
3
Latest linked story: “A City of Industry plan for a massive energy storage facility takes step forward, amid pushback on data centers” (San Gabriel Valley Tribune, 2026-01-28).
Market and operating context
- Queue date
- 2021-04-15
- Proposed COD
- 2032-02-29
- IA status
- IA Executed
- Study phase
- C14
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.