SPECTRUM ENERGY STORAGE
504 MW storage in Alameda, CA · In queue since April 2021 · Proposed COD February 2032
504 MW
Capacity
1
Components
Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Aug 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 4m
IA → COD
6y 6m
Total Duration
4y 4m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 6–18 months
Proposed COD: 2032-02-29
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-1881
- cleanview.co/power-projects/planned/battery-storage-projects/california/1881_storage/spectrum-energy-storage
- sgvtribune.com/2026/01/28/a-city-of-industry-plan-for-a-massive-energy-storage-facility-takes-step-forward-amid-pushback-on-data-centers/
Commercial operation date: Only the LBNL date exists. The aggregator pages (interconnection.fyi, Cleanview) just repeat it, e.g. 'The proposed completion date is February 29, 2032', so they are not independent confirmation. No developer press release or news article gives a different COD for this Alameda County project.
Developer: The LBNL developer field is null. The news-extracted 'Aypa Power' comes from an article about the Marici BESS in City of Industry (Los Angeles County), a different project from this 504 MW Alameda County queue entry. Nothing links the two, so I did not attribute it.
Status: LBNL lists the project as active with an IA executed, and the aggregator listings also show it as active and planned. No search result contradicts this or shows further progress.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The SPECTRUM ENERGY STORAGE project is a proposed 504 MW battery storage project located in Alameda County, California. The project is in the CAISO interconnection queue as entry CAISO-1881, with a queue entry date of April 15, 2021, and a proposed commercial operation date of February 29, 2032. The project's interconnection status is currently in the System Impact Study phase. The project is interconnected to the PGAE utility at the Tesla-Newark #1 230 kV Line point of interconnection.
The SPECTRUM ENERGY STORAGE project has been featured in recent news coverage, with two articles categorized as regulatory and industry news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Alameda
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Tesla-Newark #1 230 kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesBattery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
SPECTRUM ENERGY STORAGE Battery Storage in ISO New England queue pipeline — 1 projects by technology and status
Data-driven briefing on SPECTRUM ENERGY STORAGE — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.