Southfork Energy Storage is a 306 MW Battery project in Texas, currently active.
Southfork Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-30.
- Queue ID
- ERCOT-25INR0653
- Location
- Kimble, Texas
- Technology
- Battery
- Developer
- Southfork Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 60709 Oersted - 60616 Edison CKT 1
What stands out
Southfork Energy Storage is a 306 MW Battery project in Texas with status active.
Southfork Energy Storage, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-11-30.
Latest linked story: “A Transformative Dawn: South Fork Wind Leads America’s Offshore Reboot” (POWER Magazine, 2025-07-01).
Market and operating context
- Queue date
- 2024-07-22
- Proposed COD
- 2028-11-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.