Southfork Energy Storage (ERCOT-25INR0653) — Project Summary

Queue ID
ERCOT-25INR0653
Capacity
306.4 MW
Technology
Battery
Status
active
Location
Kimble, TX
Region
ERCOT
Developer
Southfork Energy Storage, LLC
IA Status
Facility Study

Southfork Energy Storage

ERCOT-25INR0653BetaActiveBatteryERCOTLBNL + Live

306.4 MW storage in Kimble, TX · In queue since July 2024 · Proposed COD November 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

306.4 MW

Capacity

1

Components

Battery

2y 4m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Facilities Study50%
Queue EntryJul 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-30

Queue history
25INR0653 · 27 monthly ERCOT reports, Jul 2024 – Sep 2026

Projected COD moved

1 time

Dec 2025 → Nov 2028

Net change

+35 months

first report to latest

Capacity

306 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 22, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusUnder constructionWindpower Engineering & Development · 2021-05-05
Latest milestoneCOD achieved · 2024-07POWER Magazine · 2025-07-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Nov 30, 2028
From queue filing
Developer in saved assessment
Southfork Energy Storage, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. No evidence of construction or financing was found.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-25inr0653
  2. groundtrace.io/developers/southfork-energy-storage-llc-srl5mttomp6f6
  3. infrasure.ai/ask/r/queue-projects-in-texas-3

Commercial operation date: Only the LBNL filing (proposed COD 2028-11-30) and queue aggregators (interconnection.fyi, infrasure.ai, which list 2028) address this project. The news-extracted facts and offshore wind search results concern South Fork Wind in New York, a different project, so they were discarded.

Developer: Only the LBNL filing and the groundtrace.io aggregator name Southfork Energy Storage, LLC as developer. No parent company was identified. The Ørsted/Eversource attribution belongs to South Fork Wind, an unrelated offshore wind project, and is a name-collision false match.

Status: LBNL lists the project as active with ia_status Facility Study. interconnection.fyi and infrasure.ai also show it as active. No contradicting evidence was found.

Project lifecycle
as of 2023-06-14
PhaseConstructionWindpower Engineering & Development · 2021-05-05
OperationalNoEast End Beacon · 2023-06-14
Technologyoffshore_wind±East End Beacon · 2023-06-14
DeveloperEnel Green Power North AmericaWindpower Engineering & Development · 2021-05-05
GroundbreakingAnnouncedEast End Beacon · 2023-06-14

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Southfork Energy Storage, LLC is proposing a 306.4 MW battery storage project in Kimble County, Texas. The project, identified as ERCOT-25INR0653 in the ERCOT interconnection queue, entered the queue on July 22, 2024, with a proposed commercial operation date of November 30, 2028. Its interconnection status is currently in the Facility Study phase.

The proposed project, consisting entirely of battery storage, has been the subject of recent news coverage related to grid and regulatory matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kimble

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Southfork Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 60709 Oersted - 60616 Edison CKT 1

Data Source

LBNL + Live

DeveloperØrsted and EversourcePOWER Magazine · 2025-07-01
ApplicantDominion EnergyEnvironment News Service · 2024-04-15
AgencyEPAEnvironment News Service · 2024-04-15
RulingApprovalEnvironment News Service · 2024-04-15
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (5)Beta

Last updated 2026-03-26

View all 5 articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.