Southeast Oklahoma Pumped Storage is a 1.2 GW Other project in Texas, currently active.
Apex Energy Solutions, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-01-01.
- Queue ID
- ERCOT-30INR0002
- Location
- Lamar, Texas
- Technology
- Other
- Developer
- Apex Energy Solutions, LLC
- Market / region
- ERCOT
- Point of interconnection
- 1692 Paris Switch 345kV
What stands out
Southeast Oklahoma Pumped Storage is a 1.2 GW Other project in Texas with status active.
Apex Energy Solutions, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-01-01.
Latest linked story: “Oklahoma's Own In Focus: Plans For Power Storage Facility Would Impact Hundreds Of Oklahoma Residents” (News On 6, 2024-10-10).
Market and operating context
- Queue date
- 2022-08-05
- Proposed COD
- 2030-01-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.