Southeast Oklahoma Pumped Storage (ERCOT-30INR0002) — Project Summary

Queue ID
ERCOT-30INR0002
Capacity
1232 MW
Technology
Other
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
Apex Energy Solutions, LLC
IA Status
Facility Study

Southeast Oklahoma Pumped Storage

ERCOT-30INR0002BetaActiveOtherERCOTLBNL + Live

1,232 MW generation in Lamar, TX · In queue since August 2022 · Proposed COD January 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,232 MW

Capacity

1

Components

Other

4y 3m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 5m

Facilities Study50%
Queue EntryAug 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-01-01

Queue history
30INR0002 · 43 monthly ERCOT reports, Mar 2023 – Sep 2026

Projected COD moved

0 times

Jan 2030 → Jan 2030

Net change

0 months

first report to latest

Capacity

1232 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 5, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 1, 2030
From queue filing
Developer in saved assessment
Apex Energy Solutions, LLC
Status at research time
Active
Active in the ERCOT queue (Facility Study, no IA), but the FERC hydropower proposal on the Kiamichi River in southeast Oklahoma has been rejected by federal regulators, so viability is doubtful.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. newson6.com/story/67082b353c0f14345b23ada6/oklahomas-own-in-focus:-plans-for-power-storage-facility-would-impact-hundreds-of-oklahoma-residents
  2. southwestledger.news/news/federal-regulators-again-deny-texans-kiamichi-river-proposed-hydropower-project
  3. power-eng.com/operations-maintenance/ferc-issues-preliminary-permit-to-study-1-200-mw-southeast-oklahoma-pumped-storage-project/
  4. interconnection.fyi/project/ercot-30inr0002

Commercial operation date: No post-LBNL source gives a construction schedule or COD target, so the LBNL proposed COD of 2030-01-01 stands. The date is doubtful because the Southwest Ledger reports that federal regulators again rejected the proposed $3B southeast Oklahoma hydropower plant that would serve Texas.

Developer: LBNL lists Apex Energy Solutions, LLC, while the FERC applicant in the News On 6 and Power Engineering coverage is Southeast Oklahoma Power Corporation. The two are probably the same developer group, with the Corporation as the FERC-facing project entity, but the provided sources do not state the relationship, so Apex is kept as the operating developer.

Status: LBNL and interconnection.fyi still show the queue entry as active, so the queue status is kept. The Southwest Ledger headline that regulators again denied the Kiamichi River project is a serious negative signal, and its snippet does not say whether the ERCOT entry has been withdrawn.

Project lifecycle
as of 2024-10-10
OperationalNoNews On 6 · 2024-10-10
TechnologyhydroNews On 6 · 2024-10-10
DeveloperSoutheast Oklahoma Power CorporationNews On 6 · 2024-10-10
Permit decisionDeniedNews On 6 · 2024-10-10

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Southeast Oklahoma Pumped Storage project is a proposed 1232 MW battery storage development by Apex Energy Solutions, LLC, located in Lamar County, Texas. The project, identified as ERCOT-30INR0002 in the ERCOT interconnection queue, entered the queue on August 5, 2022, and has a proposed commercial operation date of January 1, 2030. Its interconnection status is currently in the Facility Study phase.

The proposed project consists entirely of "Other Storage" technology. Recent news coverage indicates regulatory interest in the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Apex Energy Solutions, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1692 Paris Switch 345kV

Data Source

LBNL + Live

ApplicantSoutheast Oklahoma Power CorporationNews On 6 · 2024-10-10
AgencyFERCNews On 6 · 2024-10-10
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.