Query
Smokey Willie Solar SLF
Type
Entity Briefing
Entity
Smokey Willie Solar SLF
Generated
2026-10-19T16:19:20.253Z

Briefing on Smokey Willie Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Smokey Willie Solar SLF is a 201 MW Solar+Battery project in Texas, currently active.

Neches Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.

Queue ID
ERCOT-23INR0439
Location
Anderson, Texas
Technology
Solar+Battery
Developer
Neches Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 3325 Blackburn Switch – 3272 Palestine

What stands out

1

Smokey Willie Solar SLF is a 201 MW Solar+Battery project in Texas with status active.

2

Neches Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-30.

Market and operating context

Queue date
2022-01-06
Proposed COD
2028-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Smokey Willie Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0439
LocationAnderson, Texas
TechnologySolar+Battery
DeveloperNeches Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 3325 Blackburn Switch – 3272 Palestine
Queue date2022-01-06
Proposed COD2028-09-30