Smarr CC is a 2 GW Gas project in Georgia, currently active.
The reported queue phase is Facility Study. Proposed COD is 2028-03-31.
- Queue ID
- GTC-GI-193
- Location
- Monroe, Georgia
- Technology
- Gas
- Market / region
- Southeast
- Point of interconnection
- Big Smarr 500 kV substation (TBD)
What stands out
1
Smarr CC is a 2 GW Gas project in Georgia with status active.
2
The reported queue phase is Facility Study; proposed COD is 2028-03-31.
3
Latest linked story: “Oglethorpe Power Appoints Kiewit as EPC Partner for Monroe County Plant” (megaproject.com, 2026-01-15).
Market and operating context
- Queue date
- 2024-08-05
- Proposed COD
- 2028-03-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.