2,000 MW generation in Monroe, GA · In queue since August 2024 · Proposed COD March 2028
2,000 MW
Capacity
1
Components
Gas
2y 3m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
A community post cites an approval dated 11/6/25 for the 1,425 MW Monroe County plant. The approving body is not named and the source is weak.
facebook.comOglethorpe broke ground on the $3.3B, 1,425 MW gas plant near its existing Smarr Energy Facility. The exact date is not given.
electric.coopUSDA announced a record $3.3B loan for the Oglethorpe Power facility in Monroe County, GA. The exact date is not given.
news.constructconnect.comResearch sources and reasoning (7 recorded sources)
medium confidence at research time
- opc.com/newgeneration/monroecounty/
- opc.com/plant-category/gas/
- electric.coop/oglethorpe-powers-new-natural-gas-plant-will-boost-reliability-local-economy
- news.constructconnect.com/usda-announces-3.3b-loan-for-oglethorpe-power-facility-in-georgia
- powermag.com/kiewit-chosen-as-epc-for-new-1425-mw-gas-fired-power-plant-in-georgia/
- enr.com/articles/62438-oglethorpe-power-picks-kiewit-unit-as-epc-for-25b-gas-fired-georgia-power-plant
- facebook.com/groups/1155605586732309/posts/1165575805735287/
Commercial operation date: None of the search snippets give a dated in-service target. The Power Engineering snippet mentioning a target operation date is truncated, so the LBNL proposed COD of 2028-03-31 is the only usable date. The plant is under construction, so this date is plausible but unverified.
Developer: The LBNL developer field is blank, so there is no shell LLC to compare. The Oglethorpe Power project page (opc.com), POWER Magazine, ENR and the USDA loan coverage all name Oglethorpe Power as owner and developer of the Smarr CC.
Status: Oglethorpe's project page lists Smarr CC as 'Under Construction'. America's Electric Cooperatives reports a groundbreaking on the $3.3B plant, so the LBNL queue state understates the project's progress.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Smarr CC project is a proposed 2000 MW gas-fired generation project located in Monroe County, Georgia. The project is being developed within the Georgia Transmission Corporation (GTC) service area. It is listed in the GTC interconnection queue as project GTC-GI-193, with an interconnection queue entry date of August 5, 2024.
The proposed commercial operation date for the Smarr CC project is March 31, 2028. The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is planned for the Big Smarr 500 kV substation.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
GA
County
Monroe
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Big Smarr 500 kV substation (TBD)
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-05-31
View all articlesGeothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Georgia Power at Wadley GA
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Swainsboro
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Jakin GA PV
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.