Query
SIM GIDEON GAS RICE
Type
Entity Briefing
Entity
SIM GIDEON GAS RICE
Technology
gas
Generated
2026-10-19T18:32:09.534Z

Briefing on SIM GIDEON GAS RICE

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
226 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2031-05-10
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

SIM GIDEON GAS RICE is a 226 MW Gas project in Texas, currently active.

LCRA is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2031-05-10.

Queue ID
ERCOT-31INR0011
Location
Bastrop, Texas
Technology
Gas
Developer
LCRA
Market / region
ERCOT
Point of interconnection
(#7310) SIM GIDEON 138 kV

What stands out

1

SIM GIDEON GAS RICE is a 226 MW Gas project in Texas with status active.

2

LCRA is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2031-05-10.

Market and operating context

Queue date
2025-07-29
Proposed COD
2031-05-10
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SIM GIDEON GAS RICE — verified asset snapshot

FieldValue
Queue IDERCOT-31INR0011
LocationBastrop, Texas
TechnologyGas
DeveloperLCRA
Market / regionERCOT
Point of interconnection(#7310) SIM GIDEON 138 kV
Queue date2025-07-29
Proposed COD2031-05-10