Briefing on Sim Gideon Combined Cycle

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

880 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2030-12-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sim Gideon Combined Cycle is a 880 MW Gas project in Texas, currently active.

LCRA is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-12-15.

Queue ID
ERCOT-30INR0051
Location
Bastrop, Texas
Technology
Gas
Developer
LCRA
Market / region
ERCOT
Point of interconnection
(#7310) SIM GIDEON 138 kV

What stands out

1

Sim Gideon Combined Cycle is a 880 MW Gas project in Texas with status active.

2

LCRA is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-12-15.

4

Latest linked story: “Wireless technologies connect two LCRA plants” (POWER Magazine, 2008-03-15).

Market and operating context

Queue date
2025-06-19
Proposed COD
2030-12-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sim Gideon Combined Cycle — verified asset snapshot

FieldValue
Queue IDERCOT-30INR0051
LocationBastrop, Texas
TechnologyGas
DeveloperLCRA
Market / regionERCOT
Point of interconnection(#7310) SIM GIDEON 138 kV
Queue date2025-06-19
Proposed COD2030-12-15