Sim Gideon Combined Cycle is a 880 MW Gas project in Texas, currently active.
LCRA is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-12-15.
- Queue ID
- ERCOT-30INR0051
- Location
- Bastrop, Texas
- Technology
- Gas
- Developer
- LCRA
- Market / region
- ERCOT
- Point of interconnection
- (#7310) SIM GIDEON 138 kV
What stands out
Sim Gideon Combined Cycle is a 880 MW Gas project in Texas with status active.
LCRA is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2030-12-15.
Latest linked story: “Wireless technologies connect two LCRA plants” (POWER Magazine, 2008-03-15).
Market and operating context
- Queue date
- 2025-06-19
- Proposed COD
- 2030-12-15
- IA status
- Facility Study
- Study phase
- Facility Study