Sim Gideon Combined Cycle (ERCOT-30INR0051) — Project Summary

Queue ID
ERCOT-30INR0051
Capacity
880 MW
Technology
Gas
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
LCRA
IA Status
Facility Study

Sim Gideon Combined Cycle

ERCOT-30INR0051BetaActiveGasERCOTLBNL + Live

880 MW generation in Bastrop, TX · In queue since June 2025 · Proposed COD December 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

880 MW

Capacity

1

Components

Gas

1y 5m

In Queue

Facility Study

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

6 months

IA → COD

5 years

Total Duration

6 months

Construction50%
Queue EntryJun 19, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 19, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2030-12-15

Queue history
30INR0051 · 16 monthly ERCOT reports, Jun 2025 – Sep 2026

Projected COD moved

0 times

Dec 2030 → Dec 2030

Net change

0 months

first report to latest

Capacity

880 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 19, 2025
Interconnection agreement signedDec 19, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 18y 8m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activitytechnology_launchPOWER Magazine · 2008-03-15

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 15, 2030
From queue filing
Developer in saved assessment
Lower Colorado River Authority (LCRA)
Sources agreed at research time
Status at research time
Active
Active in ERCOT queue at Facility Study stage (IA date 2025-12-19). The project is a proposed 880 MW combined-cycle at LCRA's existing Sim Gideon site. No construction or permit announcement was found.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-30inr0051
  2. cleanview.co/power-projects/planned/natural-gas-power-plants/texas/30INR0051/sim-gideon-combined-cycle
  3. ercotqueue.com/project/30INR0051
  4. en.wikipedia.org/wiki/Sim_Gideon_Power_Plant
  5. powermag.com/wireless-technologies-connect-two-lcra-plants/

Commercial operation date: Only the LBNL filing gives a COD (proposed 2030-12-15). Aggregator sites such as interconnection.fyi and cleanview.co repeat the same date or 'Expected online 2030'. They are derived from the queue data, not independent. No developer press release or news article gives a different target.

Developer: LBNL lists LCRA, and the Wikipedia article and the POWER Magazine article identify the Lower Colorado River Authority as owner and operator of the existing Sim Gideon site. No shell LLC or ownership change appears.

Status: LBNL shows active status with a Facility Study. Aggregators list the project as planned or proposed, and no source reports construction, withdrawal or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Sim Gideon Combined Cycle project is a proposed 880 MW gas-fired combined-cycle generation project located in Bastrop County, Texas. Developed by LCRA, the project is interconnected within the ERCOT region under queue ID ERCOT-30INR0051. It entered the interconnection queue on June 19, 2025, with a proposed commercial operation date of December 15, 2030, and an Interconnection Agreement (IA) date of December 19, 2025. The point of interconnection is designated as (#7310) SIM GIDEON 138 kV.

This development project is linked to the existing Sim Gideon operating plant (EIA plant ID 3601). The project has been mentioned in recent news, with five articles covering topics related to the grid and industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

LCRA

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

(#7310) SIM GIDEON 138 kV

Data Source

LBNL + Live

CompanyLower Colorado River AuthorityPOWER Magazine · 2008-03-15
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.