Sim Gideon Combined Cycle
880 MW generation in Bastrop, TX · In queue since June 2025 · Proposed COD December 2030
880 MW
Capacity
1
Components
Gas
1y 5m
In Queue
Facility Study
IA Phase
Signed Dec 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
6 months
IA → COD
5 years
Total Duration
6 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 24–48 months
Proposed COD: 2030-12-15
Projected COD moved
0 times
Dec 2030 → Dec 2030
Net change
0 months
first report to latest
Capacity
880 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-30inr0051
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/30INR0051/sim-gideon-combined-cycle
- ercotqueue.com/project/30INR0051
- en.wikipedia.org/wiki/Sim_Gideon_Power_Plant
- powermag.com/wireless-technologies-connect-two-lcra-plants/
Commercial operation date: Only the LBNL filing gives a COD (proposed 2030-12-15). Aggregator sites such as interconnection.fyi and cleanview.co repeat the same date or 'Expected online 2030'. They are derived from the queue data, not independent. No developer press release or news article gives a different target.
Developer: LBNL lists LCRA, and the Wikipedia article and the POWER Magazine article identify the Lower Colorado River Authority as owner and operator of the existing Sim Gideon site. No shell LLC or ownership change appears.
Status: LBNL shows active status with a Facility Study. Aggregators list the project as planned or proposed, and no source reports construction, withdrawal or suspension.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Sim Gideon Combined Cycle project is a proposed 880 MW gas-fired combined-cycle generation project located in Bastrop County, Texas. Developed by LCRA, the project is interconnected within the ERCOT region under queue ID ERCOT-30INR0051. It entered the interconnection queue on June 19, 2025, with a proposed commercial operation date of December 15, 2030, and an Interconnection Agreement (IA) date of December 19, 2025. The point of interconnection is designated as (#7310) SIM GIDEON 138 kV.
This development project is linked to the existing Sim Gideon operating plant (EIA plant ID 3601). The project has been mentioned in recent news, with five articles covering topics related to the grid and industry.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Bastrop
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
LCRA
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
(#7310) SIM GIDEON 138 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.