Query
SILVER STAR SOLAR
Type
Entity Briefing
Entity
SILVER STAR SOLAR
Generated
2026-10-11T06:51:13.225Z

Briefing on SILVER STAR SOLAR

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
1 GW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2028-12-01
Proposed COD
C14
Queue phase
Briefing/projectactive

SILVER STAR SOLAR is a 1 GW Solar+Battery project in Nevada, currently active.

The reported queue phase is C14. Proposed COD is 2028-12-01.

Queue ID
CAISO-2142
Location
Nye, Nevada
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Lathrop Wells Substation 230 kV

What stands out

1

SILVER STAR SOLAR is a 1 GW Solar+Battery project in Nevada with status active.

2

The reported queue phase is C14; proposed COD is 2028-12-01.

3

Latest linked story: “NV Energy, NextEra and Leeward among winning bids for gigawatts of solar in Nevada desert” (Solar Power World, 2023-06-28).

Market and operating context

Queue date
2021-04-15
Proposed COD
2028-12-01
IA status
IA Executed
Study phase
C14
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SILVER STAR SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-2142
LocationNye, Nevada
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionLathrop Wells Substation 230 kV
Queue date2021-04-15
Proposed COD2028-12-01
IA statusIA Executed